TIRANA Olimpik Park

Partially
Flooring with Marmoleum Sport 4 mm
Constructor : Jon SH P K
Investitor : EUROCOL SH P K
Address: Rruga Liman Kaba, Tirana
Status: Completed, Completed
Duration : 2016 – 2016

The nature of the works carried out at Tirana Olympic Park are listed below:

• Supply + placement MARMOLEUM SPORT 3.2 mm
• Supply + installation of waterproofing in the basement walls with PLASTIVO 200
• Supply + placement of waterstop WT-102
• Supply + BREAK placement
• Supply + concrete repair installation SPIDY 15